User Tools

Site Tools


start:calculated_fields

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
start:calculated_fields [2016/08/29 11:04]
rnadler
start:calculated_fields [2016/08/29 11:06]
rnadler
Line 10: Line 10:
  
 **Calculations**:  =r2c2*r2c3/200  or = r1c1/r1c4*100%  (the percent sign is optional and will add a % sign to the result) **Calculations**:  =r2c2*r2c3/200  or = r1c1/r1c4*100%  (the percent sign is optional and will add a % sign to the result)
 +
 +**If else logic**: =(if(r2c2==0) s = 0; else if(r2c2 >= 1) s=2; else s = 3;  
  
 Note about row and column references:  The tables include a column and row for table labels.  These are row 1 and column 1.  When referencing cells the first textbox cell is typically r2c2. Note about row and column references:  The tables include a column and row for table labels.  These are row 1 and column 1.  When referencing cells the first textbox cell is typically r2c2.
start/calculated_fields.txt ยท Last modified: 2017/01/28 08:44 by rnadler